    NEW! Completed Refurbishment Project

    Our latest Lift Refurbishment project, Westminster, SW1P. – Removal of the old control system and lift machine – New Digital Advanced Control panel – New Alberto Sassi S.p.A. machine complete with A3 sheave brake – New GAL door operator –
    Read More »

    View
  • by Amalgamated Lifts Admin on 19th January 2023

    NEW! Completed Modernisation Project

    This 2 stop 1250kg MRL lift is the latest project completed by our repairs department. The works included; -Full shaft rewire and control panel. Control panel by Digital Advanced Control. Unlike most MRL’s the whole control system is built on
    Read More »

    View
  • by Amalgamated Lifts Admin on 24th October 2022

    NEW! Completed Modernisation Project

    Our latest Lift Modernisation project completed by our Construction Department. The project included for back to guides modernisation, retaining the existing doors & architraves but adapting them to Fermator Robusta.

    View
  • by Amalgamated Lifts Admin on 30th September 2022

    NEW! Completed Refurbishment Project

    Another AL Lift Refurbishment Project completed by our repairs department, SE1. – Car Reline – New Hydraulic Tank – New Control Panel & Pit Inspection Controls – 2 x Powered Door Operators – New Ropes – New Autodialler

    View
  • lift refurbishment
    by Amalgamated Lifts Admin on 26th September 2017

    Brighton Centre

    AL were appointed to complete a major refurbishment to Lifts 1 & 2 at the Brighton Centre. Brighton Centre is a conference and exhibition centre located within the city centre. Our repairs team successfully designed, supplied, installed and commissioned a
    Read More »

    View