Our latest Lift Refurbishment project, Westminster, SW1P. – Removal of the old control system and lift machine – New Digital Advanced Control panel – New Alberto Sassi S.p.A. machine complete with A3 sheave brake – New GAL door operator –
Read More »
This 2 stop 1250kg MRL lift is the latest project completed by our repairs department. The works included; -Full shaft rewire and control panel. Control panel by Digital Advanced Control. Unlike most MRL’s the whole control system is built on
Read More »
Our latest Lift Modernisation project completed by our Construction Department. The project included for back to guides modernisation, retaining the existing doors & architraves but adapting them to Fermator Robusta.
ViewAnother AL Lift Refurbishment Project completed by our repairs department, SE1. – Car Reline – New Hydraulic Tank – New Control Panel & Pit Inspection Controls – 2 x Powered Door Operators – New Ropes – New Autodialler
ViewAL were appointed to complete a major refurbishment to Lifts 1 & 2 at the Brighton Centre. Brighton Centre is a conference and exhibition centre located within the city centre. Our repairs team successfully designed, supplied, installed and commissioned a
Read More »
Click the button below to submit your details and download your very own copy.