Delivering Another Successful Project

Delivering Another Successful Project

Our Repairs Department deliver another successful hydraulic lift replacement within the Health Sector 🩺🚑 – Successfully relocating the control panel from the ground floor to the top floor ⬆️

The hydraulic tank also being relocated to the top floor from the lift pit, creating a safer and easier space to work on going forward➡️

 

  • Posted on: 17th April 2026