  • by Amalgamated Lifts Admin on 31st March 2023

    NEW! Completed Refurbishment Project

    Our latest Lift Refurbishment project, Westminster, SW1P. – Removal of the old control system and lift machine – New Digital Advanced Control panel – New Alberto Sassi S.p.A. machine complete with A3 sheave brake – New GAL door operator –
    Read More »

    View
  • by Amalgamated Lifts Admin on 19th January 2023

    NEW! Completed Modernisation Project

    This 2 stop 1250kg MRL lift is the latest project completed by our repairs department. The works included; -Full shaft rewire and control panel. Control panel by Digital Advanced Control. Unlike most MRL’s the whole control system is built on
    Read More »

    View
  • by Amalgamated Lifts Admin on 24th October 2022

    NEW! Completed Modernisation Project

    Our latest Lift Modernisation project completed by our Construction Department. The project included for back to guides modernisation, retaining the existing doors & architraves but adapting them to Fermator Robusta.

    View
  • by Amalgamated Lifts Admin on 30th September 2022

    NEW! Completed Refurbishment Project

    Another AL Lift Refurbishment Project completed by our repairs department, SE1. – Car Reline – New Hydraulic Tank – New Control Panel & Pit Inspection Controls – 2 x Powered Door Operators – New Ropes – New Autodialler

    View
  • MRL gearless traction lift
    by Amalgamated Lifts Admin on 26th September 2017

    Upper Richmond Road

    Amalgamated Lifts installs a MRL gearless traction lift serving 2 floors within a London SW14 Commercial Property. Prominent. Glass encased. Masculine.   The lift has a load of 600 kg with a speed of 1m/s, with automatic doors. The car
    Read More »

    View
  • lift refurbishment
    by Amalgamated Lifts Admin on 26th September 2017

    Brighton Centre

    AL were appointed to complete a major refurbishment to Lifts 1 & 2 at the Brighton Centre. Brighton Centre is a conference and exhibition centre located within the city centre. Our repairs team successfully designed, supplied, installed and commissioned a
    Read More »

    View
  • by Amalgamated Lifts Admin on 3rd June 2016

    Mirror Mirror on the Wall

    Our clients at the Courthouse, SW1, required the leather square padded panels within the lift car to be replaced. Over time these padded panels were damaged and suffered wear and tear from the many lift users, as seen in the
    Read More »

    View
  • by Amalgamated Lifts Admin on 3rd June 2016

    Introducing Mark Vick and Steve Williamson

    Mark Vick has joined our team and been appointed Service Manager. Mark has invaluable experience, knowledge and has developed outstanding relationships with his clients in the lift industry. Mark will enhance the customer experience across our service portfolio. m.vick@al-lifts.co.uk Joining
    Read More »

    View
  • by Amalgamated Lifts Admin on 25th August 2015

    New Modernisation at Biscuit Building

    Hidden to the rear of the Tea Building, the Biscuit Building in Shoreditch is home to Mother London and our latest modernisation. We are currently modernising a duplex set of lifts that are found in the main entrance foyer. Mother,
    Read More »

    View
  • by Amalgamated Lifts Admin on 25th August 2015

    Amalgamated Secures University of Brighton Contract

    Brighton University has selected Amalgamated Lifts Limited to carry out reactive and preventative maintenance services to 63 lifts across the University’s student accommodation sites and campuses. The comprehensive contract will require monthly planned maintenance visits, callout and repair services as
    Read More »